CarbonTiers · User guide

MRV Pro User Guide

CarbonTrack MRV Pro — ETS Monitoring & Verification Workbook

MRR (EU) 2018/2066 · AVR (EU) 2018/2067

This guide explains how to build the monitoring, reporting and verification (MRV) file of an EU ETS installation in the tool: monitoring plan, source stream classification, tiers and uncertainty, metering and sampling, data flow and the control system, deviations, the annual emissions report, the verification file, the improvement report and the evidence register. Rules and tables are generated from the tool’s own records.

16
workbook modules
10
source stream families
15
compliance check families
10
years of evidence retention
Version
1.0
Last reviewed
19 October 2026
Current edition
carbontiers.com/calculator/mrv-pro/guide

This guide is updated with the tool. Counts and factor tables are generated from the registries the tool calculates with. The latest edition is always at the address above.

1About the tool

MRV Pro manages the monitoring file an EU ETS installation presents to its verifier and competent authority: which monitoring quality is required (installation category, source stream class, minimum tier), how it is evidenced (instruments, sampling, uncertainty, controls) and whether the annual emissions report is ready for verification. It is built for operators, MRV managers, consultants and teams preparing for verification.

Modules
GroupModuleContentIn trial
Monitoring planMonitoring PlanInstallation, category, boundaryOpen
Monitoring planSource StreamsFuels, materials, classificationOpen
Monitoring planTiers & MethodologyMinimum tiers, gap analysisOpen
Data & measurementMetering & CalibrationInstruments, certificatesLicence required
Data & measurementSampling & AnalysisLaboratory, frequencyLicence required
Data & measurementMeasured SourcesCEMS, corroborationLicence required
Data & measurementUncertaintyParameter and overall uncertaintyLicence required
Control systemData FlowSteps, owners, systemsLicence required
Control systemRisk AssessmentInherent and residual riskLicence required
Control systemControl ActivitiesArt. 60-65 categoriesLicence required
Control systemDeviations & CAPAData gaps, substitute methodLicence required
Report & verificationAnnual Emissions ReportSummary, checks, readinessOpen
Report & verificationVerification FileVerifier, opinion, findingsLicence required
Report & verificationReport WorkflowStatuses, versions, deadlinesLicence required
Report & verificationImprovement ReportArt. 69 obligationLicence required
Report & verificationEvidence RegisterEvidence retentionLicence required

2Quick start

  1. 1

    Pick the reporting year

    Choose the year in the top bar. Each year is a separate record.

  2. 2

    Complete the monitoring plan

    Operator, installation, permit details and the emissions figure the installation category rests on. The category is derived automatically.

  3. 3

    Add source streams

    Enter the family, activity data and factors of each fuel and material; classification (major, minor, de minimis) is automatic.

  4. 4

    Close tier gaps

    Tiers & Methodology shows the required tier of every parameter and the gap to the declared tier.

  5. 5

    Attach the evidence

    Instruments, sampling plans, uncertainty, data flow, risks and controls.

  6. 6

    Check the readiness score

    Annual Emissions Report shows total emissions, compliance findings and the readiness score; each finding names the module where it is fixed.

  7. 7

    Send for verification

    Track the process and deadlines in Verification File and Report Workflow; download the Excel and PDF report.

3EU ETS rules in the tool

TopicEU ETS (MRR / AVR)
Legal basisCommission Implementing Regulation (EU) 2018/2066 (MRR) and (EU) 2018/2067 (AVR)
Name of the plan documentMonitoring Plan
Basis of the installation categoryMRR Art. 19(2) — annual AVERAGE VERIFIED emissions of the preceding trading period.
Verification deadline (t+1)ETS1: 31 March · ETS2: 30 April
MRV below the scope thresholdNo
Evidence retention10 years

The installation category rests on the annual average verified emissions of the preceding trading period. A first-year installation without history falls back on the current year’s own total, so the tier requirements are never silently the lowest possible.

4Installation category and source stream class

Installation categories (t CO₂e/yr) and improvement report interval
CategoryAnnual emissionsImprovement report at the latest every
A≤ 50,0005 years
B50,000 – 500,0004 years
C> 500,0003 years

Installations emitting less than 25,000 t CO₂e a year may use the low-emitter simplifications (MRR Art. 47).

Source stream classification (MRR Art. 19(3))
ClassRule
De minimisSmallest streams TOGETHER ≤ max(1,000 t; 2% of total), capped at 20,000 t
MinorSmallest streams TOGETHER ≤ max(5,000 t; 10% of total), capped at 100,000 t
MajorAll other streams

5Tiers and gap analysis

  • Category A installations, and the calculation factors of commercial standard fuels in any category, take their minimum tier from Annex V.
  • In every other case major streams must apply the highest tier Annex II defines (Art. 26(1)(b)).
  • The oxidation and conversion factors always require the lowest tier (Art. 26(4)).
  • De minimis streams sit outside the tier system; conservative estimates are allowed (Art. 26(3)).
  • Floor with justification: one level below the requirement for a category C major stream, two for category A/B major streams, tier 1 for minor streams. A tier below that floor cannot be cured by a justification; the tool reports the two cases separately.
Maximum activity-data uncertainty (MRR Annex II Table 1)
Stream familyTier 1Tier 2Tier 3Tier 4
Commercial standard fuel± 7.5 %± 5.0 %± 2.5 %± 1.5 %
Other gaseous / liquid fuel± 7.5 %± 5.0 %± 2.5 %± 1.5 %
Solid fuel± 7.5 %± 5.0 %± 2.5 %± 1.5 %
Flare gas± 17.5 %± 12.5 %± 7.5 %—
Process material± 7.5 %± 5.0 %± 2.5 %—
Carbonate scrubbing± 7.5 %———
Other process± 7.5 %± 5.0 %± 2.5 %—
Iron & steel mass balance (Annex IV §2)± 7.5 %± 5.0 %± 2.5 %± 1.5 %
Cement clinker — CKD/LKD (Annex IV §9)± 7.5 %± 5.0 %± 2.5 %—
Aluminium electrolysis — anode effect PFC (Annex IV §4)± 2.5 %± 1.5 %——
Annex V minimum tiers (category A and commercial standard fuel factors)
Stream familyActivity dataNet calorific valueEmission factorOxidation factorConversion factorCarbon content
Commercial standard fuel2221——
Other gaseous / liquid fuel2221——
Solid fuel1221——
Flare gas1—11——
Carbonate scrubbing1—1—1—
Process material1—1—1—
Other process1—1—1—
Iron & steel mass balance (Annex IV §2)1————2
Cement clinker — CKD/LKD (Annex IV §9)1—1—1—
Aluminium electrolysis — anode effect PFC (Annex IV §4)1—1———

6Metering, sampling and uncertainty

  • Metering & Calibration: meters and weighing systems, calibration certificates and their validity.
  • Sampling & Analysis: laboratory, accreditation, sampling frequency and analytical method.
  • Measured Sources: emission points monitored by CEMS, with calculation-based corroboration.
  • Uncertainty: the relative uncertainties of independent parameters combine in quadrature; the installation total is built from emission-weighted absolute uncertainties. Averaging percentages instead would let a small, badly metered stream distort the result.

7Data flow and control system

  • Data Flow: every step from raw data to the report, with its owner and system.
  • Risk Assessment: inherent risk of each step and the residual risk after controls.
  • Control Activities: controls by the MRR Art. 60-65 categories.
  • Deviations & CAPA: data gaps, the substitute method used and corrective and preventive actions.

8Annual emissions report and readiness score

The Annual Emissions Report page computes total emissions from the source streams and measured sources, then runs the whole file through the compliance checks. Each finding carries a code, a severity, a legal basis and the module where it is fixed.

Readiness score = 100 − 12 × blockers − 4 × warnings − 1 × infos
Clamped to 0–100. A file with an open blocker is not verifiable, and the weights make the score say so.
Check families
CodeArea
MP-…Monitoring plan
SS-…Source streams
TR-…Tiers
IN-…Instruments
LA-…Laboratory and sampling
ME-…Measured sources
UN-…Uncertainty
DF-…Data flow
RA-…Risk assessment
CT-…Control activities
DV-…Deviations
VR-…Verification
WF-…Report workflow
IM-…Improvement report
EV-…Evidence register
GWP values used in the report (MRR Annex VI)
GasGWP
CO21
CH425
N2O298
CF47390
C2F612200

9Verification, workflow and evidence

  • Verification File: verification body, opinion and closure of findings.
  • Monitoring plan statuses: Draft, Submitted, Approved, Under modification. The plan is editable only while it is a draft or under modification.
  • Annual emissions report statuses: Draft, Under verification, Submitted, Verified, Under modification requested by verifier, Reported data finalised, Estimated conservatively, Under modification requested by CA.
  • Versioning: revising an approved or finalised document raises the major version; revising one that is only submitted raises the minor version. The tool assigns versions itself.
  • Report Workflow tracks the deadlines; a deadline shows as due soon 60 days ahead.
  • Improvement Report: maximum interval by category in the table above; an overdue report is raised as a finding.
  • Evidence Register: every evidence document is kept for at least 10 years.

10Saving and reporting

ActionDescription
Workbook file (.carbontrack)MRV Pro data lives in the CarbonTrack workbook, so a customer with both licences keeps a single file. Records are year-scoped.
Excel reportWorkbook with the tables of every module and the compliance findings.
PDF reportSummary report for the verifier and management.

11Troubleshooting

SymptomLikely causeFix
Category higher than expectedThe category rests on average verified emissionsEnter the historical figure in the Monitoring Plan
A stream is not de minimisThresholds apply to the smallest streams togetherExpected behaviour; see the classification table
A tier gap cannot be justifiedThe declared tier is below the permitted floorImprove the monitoring; a justification is not enough here
Imported streams at tier 1CarbonTrack carries no tier evidenceEnter the tier and uncertainty with their evidence
Total differs from the corporate inventoryDifferent GWP setsExpected behaviour; see the note above
The plan cannot be editedThe plan is submitted or approvedMove it back to draft in the workflow; a new version opens

12Glossary

TermMeaning
MRVMonitoring, reporting and verification
Source streamFuel or material whose use gives rise to emissions
TierDefined level of data quality for a parameter
UncertaintyRelative half-width of the 95 % confidence interval
CEMSContinuous emissions monitoring system
CAPACorrective and preventive action
AERAnnual emissions report
ETS1 / ETS2EU ETS for installations and aircraft operators / for regulated entities
MRR / AVREU Monitoring & Reporting and Accreditation & Verification Regulations

13References

  • Directive 2003/87/EC as amended by (EU) 2023/959.
  • Commission Implementing Regulation (EU) 2018/2066 (MRR).
  • Commission Implementing Regulation (EU) 2018/2067 (AVR).

Revision history

19 October 2026First edition.